  • The bridge was therefore built from the top down, using a balanced cantilever construction method.
  • These were prefabricated on shore and put in place using balanced cantilever methods.
  • This type of construction lends itself well to balanced cantilever construction where the bridge is built in both directions from a single support.
  • The first phase will be to remove the double balanced cantilever span.
  • It is a three span, twin concrete box girder structure built using balanced cantilever construction.
  • The bridge was constructed segmentally, using a balanced cantilever construction method.
  • The bridge itself consists of single-pour concrete columns and form traveller-constructed balanced cantilever decks.
  • At the time of its construction, it was the first bridge constructed in the United States using the segmental balanced cantilever method.
  • The bridge is a single-cell prestressed concrete box girder bridge that was built using the balanced cantilever method.
  • The new bridge is the first in Ohio to use the cast-in-place reinforced concrete box with the balanced cantilever method of construction.
  • This required the use of balanced cantilever construction methods to position pre-cast concrete bridge segments at heights of up to above the active motorway.
  • The arches and deck were constructed using a balanced cantilever method.
  • The bridge is a balanced cantilever design with reinforced concrete box girders supporting the arms.
  • The superstructure of the bridge is pre-cast segments erected by the balanced cantilever method.
  • It is one of the largest balanced cantilever cast in situ box girder bridges in Australia.
  • The bridge was constructed in 21 months using the balanced cantilever method and opened to traffic on July 2007.
  • The structures are built using balanced cantilever segmental construction.
  • Because of the need for more strength at the balanced cantilever's supports, the bridge superstructure often takes the form of towers above the foundation piers.
  • Prestressed concrete balanced cantilever bridges are often built using segmental construction.
  • The swing bridge spans approximately 100 metres and has two balanced cantilever arms that swing open to permit boats to pass up river.